Solar · HVAC · Fire Fighting · EPC since 2017WhatsApp +91 62036 99390

Compliance guide

Solar standards and certifications: BIS, IS 12933, IEC and MNRE

Understand what a standard number, licence, test report, ALMM listing and project certificate actually prove.

☀SSmartSurvey → Design → Supply → Service
01

Solar thermal standards

The IS 12933 family addresses solar flat-plate collectors; BIS listings show revised 2025 parts. All-glass evacuated-tube systems and their direct-insertion tanks are covered by separate Indian Standards such as IS 16544 and IS 16542. Always confirm the current notified standard and QCO transition status for the date of supply.

02

PV conformity

PV modules and inverters may require BIS registration and applicable IEC/IS tests. A certificate must identify the manufacturer, model family, standard, validity and issuing body. A component passing a laboratory test does not automatically prove that the entire installed system is safe or scheme-eligible.

03

MNRE lists and scheme rules

ALMM and domestic-content requirements are programme-specific and can change. Verify the current MNRE list, model number and effective dates. Scheme eligibility can additionally require a registered vendor, portal workflow, approved capacity and DISCOM completion.

04

Procurement verification

Before approval, capture certificate URLs or copies, licence status, model cross-reference, test reports, warranty, serial traceability and approved deviation notes. Recheck status at dispatch if the procurement period is long. State clearly when evidence is pending.

Verification links

Check current official information

Scheme, certification and regulatory status can change. These links were reviewed in August 2026; the live official page controls.

BIS Standard DetailsOpen official source ↗BIS Compulsory CertificationOpen official source ↗MNRE ALMMOpen official source ↗

SS Enterprises · Patna

Turn this guide into a site-specific proposal.

Share the location, recent bill or hot-water demand, roof photographs and preferred timeline. We will identify the missing survey data before quoting.

Start technical enquiry →
WAAsk on WhatsApp