Solar · HVAC · Fire Fighting · EPC since 2017WhatsApp +91 62036 99390

Bihar subsidy guide

Bihar rooftop solar subsidy and PM Surya Ghar application steps

Use the live national portal and current DISCOM workflow; never rely on an old subsidy chart or verbal promise.

☀SSmartSurvey → Design → Supply → Service
01

Who should verify

Residential consumers should check the current PM Surya Ghar portal for eligibility, CFA structure, capacity limits, registered vendors and required documents. Commercial or institutional systems may not receive the same residential support. Consumer category and meter ownership must match the application.

02

Application sequence

Register with state, DISCOM and consumer details; submit the rooftop application; wait for feasibility approval; select a registered vendor; install the compliant system; submit plant details; complete inspection and net meter; receive commissioning evidence; then submit bank and redemption details as the portal directs.

03

DCR and equipment

Subsidy-linked residential systems may require domestically manufactured cells and modules and other programme conditions. Match the exact module model to current lists and invoices. Do not substitute equipment after approval without written acceptance.

04

Fraud prevention

Use official portal links, verify vendor registration, pay only against written milestones, retain invoices and never share OTP, UPI PIN or banking credentials. A vendor cannot guarantee subsidy release because portal, inspection and eligibility decisions involve government and DISCOM authorities.

Verification links

Check current official information

Scheme, certification and regulatory status can change. These links were reviewed in August 2026; the live official page controls.

PM Surya Ghar National PortalOpen official source ↗MNRE Approved Models and Manufacturers (ALMM)Open official source ↗Bihar Electricity Regulatory CommissionOpen official source ↗

SS Enterprises · Patna

Turn this guide into a site-specific proposal.

Share the location, recent bill or hot-water demand, roof photographs and preferred timeline. We will identify the missing survey data before quoting.

Start technical enquiry →
WAAsk on WhatsApp